Friday, April 11, 2008

Deck - Work Day Three

Work day three really saw the deck grow to it full size and it is a big deck. Really big.



This picture is from the gate in the fence in the backyard. You can see the juniper on the hillside and the staircase that I build over Xmas break last year.

The angle from center backyard.


This is the other corner of the fench. Notice the Forythia on this section of the hill.

The floor boards begin.


The deck design is a 1/2 octogon. Here you can see the angles.


The flooring being installed.

Deck - Work Day Two

Work day two was still pre-permit so they did some more demolition and also started getting the footers in place. They were also abel to start the framing of the deck.



Looking toward the backyard. The concrete blocks that are used for the footings. Interestingly, I have learned that footing no longer need to be poured concrete. I had 2 different contractors tell me that doing it this way with blocks is faster, easier, and just as strong.



Starting to frame the floor joists. The deck is pretty large and the number of footings was pretty impressive. The footing are dug about 3 feet deep, which is crazy since the dirt in my backyard is filled with the stone underlayment from the driveway. It SUCKS to dig in.


I was trying to take some pictures of the holes for the footings.


4 footings along the side of the house.


This pictures shows where the deck will be. It is going to be nice to have a flat and usable space in my backyard.


This is standing at the fence in my backyard looking back at the house. I thought this was a good angle to see the scope of work that they will do. I will try to continue taking a picture from this angle as the job continues.

Wednesday, April 9, 2008

Deck - Work Day One

Here are some pictures from the first day of work on the deck.


Some Material Arrives. Because of the slope of the yard, the driveway became staging area #1.



More Staging of Materials. You can also see Mathew's Sandbox. :)





Some of the Demolition that was done on what will eventually become the covered porch.


Existing platform and staircase from the garage. We are keeping this, but the staircase will end at the deck.


Looking Up at the Deck from the backyard. The hard partially torn out the floorboards. No railing, it is about 20' up in the air. I don't think I would have liked doing that job.



The upper porch that will become screened in. And the beginning of the landing for the new staircase.

Thursday, April 3, 2008

broadwell's run

thinking hitting it up this weekend, but i don't know what i'm gonna get. thinking about some mid size shrubs, maybe a flowering tree (quince?). anybody? i'm struggling.

***UPDATE***
the result (both mine and brandon's):




My Back!

Here is what I have sitting around my yard that needs to get in the ground.

10 Azaleas
8 Indian Hawthorns
5 Holly Ferns
3 Kimberly Ferns
3 Crepe Myrtles
2 Water Plants
1 Hydrangea
Relocate 3 other plants

I think I went overboard and man it is going to hurt.

Deck Work Day 1

Well, today was the first day of work on the Deck. I will be posting pictures as things progress. Kristin who works from home said that the next few weeks are going to be tough at best as the construction noise is quite significant.

First shoots from my hibiscus

Two weeks ago I looked in a planter on our deck and all I saw was the cut off roots of my hibiscus. You're supposed to be able to cut it back to the dirt, but after seeing nothing, I was a little concerned. I got it last year at Lowe's. It was root-bound and the outdoors manager saw me looking at it. "It's your's for $5", he said. The price tag said $15 or $20 (can't remember exactly). I brought it home and it went gangbusters. Big, huge white flowers for weeks in the middle of the drought. So, I was really hoping to see it come back strong.

Last night I looked at it again and saw a few shoots. This morning I took this picture and I swear, overnight it's grown.